Hi ,
I need either formula or macro to get correct result for attached sheet.
I have sheet with 2 criterias.
1. current level (COLUMN E) and current annual cost and monthly cost is calculating(from COLUMN J - U) based on current level anual cost
2. When i changed proposed level (COLUMN G) , proposed anual cost also will change and monthly cost should calculate based on role change month (COLUMN I).
for example role change month is APR, from Jan - Mar monthly cost need to calculate on current level and from APR onwards should be as per proposed annula cost for next months also.
Could you please help me.
Thanks,
Sekhar.
Bookmarks