    Hello folks,

    How can I concatenate values with criteria that must fall within the specified dates? I tried to use the stringconcat formula and combine AND with IF to cover the criteria that must fall within the specified dates but it did not give me the expected result.
    Anyone, please help. Attach is the file. Kindly check & correct my formula in cell B3.

    Thanks in advance
    Attached Files Attached Files

  2. #2
    Forum Guru Winon's Avatar
    Join Date
    02-20-2007
    Location
    East Rand, R.S.A.
    MS-Off Ver
    2010
    Posts
    6,113

    Re: How to concatenate values with criteria that must fall within 2 dates?

    Hello jomi9501,

    The info in your Workbook is incoherent. Where does "IN", "PC", or "NG" etc. Come from?
    Please consider:

    Be polite. Thank those who have helped you. Then Click on the star icon in the lower left part of the contributor's post and add Reputation. Cleaning up when you're done. If you are satisfied with the help you have received, then Please do Mark your thread [SOLVED] .

  3. #3
    Registered User
    Join Date
    07-09-2012
    Location
    Riyadh Saudi
    MS-Off Ver
    Excel 2007
    Posts
    28

    Re: How to concatenate values with criteria that must fall within 2 dates?

    those are the values that I need to concatenate in reference to dates as criteria. The visual basic module for stringconcat is already copied. The formula works for single criteria only ( no AND function) but what I need in the criteria is within the range of 2 date specified.

  4. #4
    Forum Guru Winon's Avatar
    Join Date
    02-20-2007
    Location
    East Rand, R.S.A.
    MS-Off Ver
    2010
    Posts
    6,113

    Re: How to concatenate values with criteria that must fall within 2 dates?

    Hello jomi9501,

    This is how I would do it, without VBA.

    Also see the "Please consider" note at the bottom of this post.
    Attached Files Attached Files

  5. #5
    Registered User
    Join Date
    07-09-2012
    Location
    Riyadh Saudi
    MS-Off Ver
    Excel 2007
    Posts
    28

    Re: How to concatenate values with criteria that must fall within 2 dates?

    Thanks Winon, that will be helpful but the project column is a living file which will be added once there are new projects. In that case, I will always have to revise the concatenate formula since it's until row 36. Is there any other formula that I don't have to revise everytime that there is an added data on the project column?

  6. #6
    Forum Guru Winon's Avatar
    Join Date
    02-20-2007
    Location
    East Rand, R.S.A.
    MS-Off Ver
    2010
    Posts
    6,113

    Re: How to concatenate values with criteria that must fall within 2 dates?

    Hello jomi9501,

    Just extend the Concatenate range beyond the anticipated Maximum, and that should take care of your "problem".

    For example:
    Please Login or Register  to view this content.
    or even up to B10000 or beyond for that matter, and drag it across and down as required.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1