so i have a worksheet "Production Timesheet Checklist" that has a field with a date in it.

i need a macro that adds "7" to a date field ("B1"). Also need the macro to ask if the date should be updated.

i guess i need the worksheet open function to make this work. not sure of what else i need to do.

thoughts everyone?