Thanks Barry,
The problem is that my boss is basically wanting to know how long each individual connection takes to cut.

I'm not sure I can collaborate any data together to make the formula easier.

Every single change, may that be material grade, or , connection, will alter the time.

I'm not sure i'm explaining this very well!!