    Hi,

    I am looking to create a schedule in Excel quite similar to a Gantt chart. The only difference is that I would like my schedule to be on a single series(bar) on my chart instead of on multiple bars. I have attached a screenshot to show an example of the format I am referring to (I have done this manually). I had originally tried to do this with MS Visio but wasnt succuessful so I am now exploring a solution in Excel. Within the chart options, a stacked bar chart seems to only have a maximum of two values applicable but for my purpose I need the option of potentially 100!
    Can anyone think of an approach to do this?

    Thanks in advance.

    David
    Attached Images Attached Images

  2. #2
    Forum Contributor
    Join Date
    09-13-2011
    Location
    USA
    MS-Off Ver
    Excel 2007
    Posts
    216

    Re: Gantt/schedule chart with single series

    Hi David Mackle

    It can be done.

    Here is a sample file attached where you have to adjust the colors manually by name.

    However, it could probably be done systematically by creating a charting range by time period that looks up the name using the NA() function if they didn't work that hour.


    Steve=True
    Attached Files Attached Files

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1