    Hello all

    My name is Eric and i've come across a problem re: Concurrent Useage that I am hoping someone is able to help me out with. I have done a search and almost found what I was looking for but the equation did not work for me. (The similar question: http://www.excelforum.com/excel-work...ent-calls.html)

    What I am able to pull as data is specifically:

    MM/DD/YY 00:00am/pm

    I have a Start time and End time and need to find the number of instances where those times overlap. The catch is that I have some start times and end times that end in the same day, and some end times that end many days later.

    What I am working on is a pool car system where there is a fleet of vehicles that are checked out at various times for an unknown duration. The start time is the time someone is requesting a car and the end time when they feel that they will be done so the requested time could be a few hours or many days.

    Is anyone able to assist? I appreciate any and all help anyone can give, thank you so much!

    -Eric

  2. #2
    Forum Guru TMS's Avatar
    Join Date
    07-15-2010
    Location
    The Great City of Manchester, NW England ;-)
    MS-Off Ver
    MSO 2007,2010,365
    Posts
    48,426

    Re: Concurrent Useage calculations help needed

    Please post an example workbook with some typical data and an indication of what you want the output to look like.


    Regards
    Trevor Shuttleworth - Retired Excel/VBA Consultant

    I dream of a better world where chickens can cross the road without having their motives questioned

    'Being unapologetic means never having to say you're sorry' John Cooper Clarke


  3. #3
    Registered User
    Join Date
    03-31-2011
    Location
    San Diego, CA
    MS-Off Ver
    Excel 2003
    Posts
    2

    Re: Concurrent Useage calculations help needed

    This is a very small sample with my manual calculating/looking:

    Reservation Start Reservation End Number of Cars Reserved
    03/01/11 11:00am PST 03/01/11 2:00pm PST 1
    03/01/11 2:00pm PST 03/01/11 3:30pm PST 2
    03/01/11 2:30pm PST 03/02/11 9:00am PST 3
    03/01/11 3:45pm PST 03/07/11 3:45pm PST 4
    03/02/11 10:00am PST 03/02/11 12:00pm PST 3
    03/02/11 11:00am PST 03/02/11 12:30pm PST 3
    03/02/11 12:15pm PST 03/02/11 1:30pm PST 4
    03/02/11 12:15pm PST 03/02/11 2:30pm PST 4

    As you can see, there are multipe overlapping dates and times of when the cars are checked out (when their reservation starts and when it ends). I am trying to figure out how to calculate this.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1