Hi all,

im tryign to get the difference between two dates in working weeks (5 day weeks)

eg
A1
28/10/2011

A2
18/08/2011

=(A1-A2)/7 give us 10.14 which is wrong for what we need, we need it to be a 5 day week not 7 so should give us 10.2

this do able?
Thanks