Hi Everyone,
I'm currently researching different methods for creating a project scheduling template) of which there are many varieties.
The part I'm struggling with is where multiple engineers are assigned to a single project. Most tempaltes and formulas (vlookup, offset / match etc) I've been toying around with typically only have a one to one lookup feature and haven't been suitable. Where there's only one tech per project, I have no problem.
What I'm trying to do is to create a spreadsheet with the following rules:
1. Assign an engineers to a Project at a start/end date/time.
2. One engineer can only be scheduled to a single project at a time (pretty obvious).
3. Multiple engineers may be assigned to a single project at any time as well.
The first two are easy, the thrid one is where I get multiple values in lookup functions and can only display the details of one engineer's name at any time.
Before I jump headlong into discussing formulas, I'm trying to come up with a format of a spreadsheet that can actually display this data.
If I can get the format right, the formulas shouldn't be a problem.
Just need some creative ideas, I've tried several formats and hit a mental block. Hopefully some fresh persective might help me to re-think how to approach this from the start again.
Thanks in advance, Richard.
Bookmarks