Results 1 to 5 of 5

Working out a formula for problem

Threaded View

  1. #1
    Registered User
    Join Date
    01-11-2009
    Location
    Sydney
    MS-Off Ver
    Excel 2007
    Posts
    13

    Working out a formula for problem

    I need help with a spreadsheet i need to work out a formula for my spreadsheet which I use to work out cutting lists for timber frames.

    I need it to work out if the width of a job is for eg 2400mm i need to work out how many timber studs I need so the space between each stud is between 400mm and 500mm and this will need to work for a range of different sizes of frames.

    I have it written at the moment and it just devides the width by 400 and gives me a amount of studs but it would work much better if it could space them between 400 & 500.

    Thanks Pricey
    Last edited by pricey74; 01-11-2009 at 09:27 AM.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1