If A1 is a date and B1 is a date. B1 is always scheduled to be 7 days after A1 but can be +/- 2 days. I need to hilight B1 when it is out of the +/- 2 day window with out hilighting empty cells.
Thanks
Gohan51D
If A1 is a date and B1 is a date. B1 is always scheduled to be 7 days after A1 but can be +/- 2 days. I need to hilight B1 when it is out of the +/- 2 day window with out hilighting empty cells.
Thanks
Gohan51D