I'm trying to forecast Russian equipment losses where my y axis variable is the total of Russian equipent losses over time. Given the nature of this variable, any future value can only be equal to or larger than the present value, but when I produce a 95%CI forecast, the lower bound goes below the present value. Is there any way I can prevent this from happening?

Thanks!