Hey everyone,
This is my first time posting here but most likely not my last. I need to make a distance-time graph for Physics. So meters are on the y-axis and times on the x-axis. (Times are of how long a marble takes to reach each meter).

Here are the images for what Excel is doing, and the chart I am trying to make.


Thanks,
Charge