Hello,

So I have production data vs. date and I am trying to stretch this so that it takes 25% longer to reach the same final ultimate production but 25% longer. The curve is not linear.

I've been trying many things like modifying a slope, and other math functions but I cannot wrap my head around how to do it in Excel. Any thoughts? Has someone done something like this before?

Thanks