Hello.
I have a excel spreadsheet with two worksheets; Sheet1 and Sheet2
I create a single column in Sheet1 with the following values:
1
2
3
4
5
I then highlight those values and paste them as a 'Link' onto Sheet2.
In Sheet1, if I change the value 1 to 1a, this change is reflected in Sheet2 (which is linked).
However, if I add a row in Sheet1 (perhaps in between the current values) eg:
Sheet1
1
2
3
3a
4
5
The adding of the row is not reflected in Sheet2, only the linked cells are updated.
Is there a way to ensure that any changes to the entire column are reflected between sheets using linked cells?
Thanks
Bookmarks