Hello, I have timesheets, and I would like to calculate the period end, given the period start. Timesheets are turned in ever second and fourth friday of the month, so they always start on the saturday after one of those days. For example, if the period start is the saturday after the fourth friday, the end should be the second friday of the net monday.

Thanks!