    MAX testing using dates

    Hi All,

    I'm not 100% sure I'm using the right formula for this.

    on the attached I have a line that shows that a job is running from 20/3 to 25/03. This would mean that it is running over 2 shifts per day (Morning and Afternoon)

    In the main spreadsheet I'm working on I am using a Max formula because I need to know the maximum number of staff required per shift per day. This is shown in B7:D12.

    What I need it to do is show the staff number over each shift per day.

    So the example attached should look like -


    Max staff Morning Max staff Afternoon
    20/03/2013 1 1
    21/03/2013 1 1
    22/03/2013 1 1

    etc...

    Any ideas would be appreciated.
    Attached Files Attached Files

  2. #2
    Forum Moderator - RIP Richard Buttrey's Avatar
    Join Date
    01-14-2008
    Location
    Stockton Heath, Cheshire, UK
    MS-Off Ver
    Office 365, Excel for Windows 2010 & Excel for Mac
    Posts
    29,464

    Re: MAX testing using dates

    Hi,

    I don't understand the rules as they apply to your process data on row 2.
    The number of staff required is shown in I2 although it's not clear how this single number is used to generate a maximum number somewhere else since this implies an evaluation of several numbers.

    If you can describe precisely what you want to achieve with reference to your original data, state the rules and relationships and manually add some typical results for various scenarios and examples then we may be able to help further.
    Richard Buttrey

    RIP - d. 06/10/2022

    If any of the responses have helped then please consider rating them by clicking the small star icon below the post.

  3. #3
    Forum Contributor
    Join Date
    06-20-2012
    Location
    Derby
    MS-Off Ver
    Excel 2010
    Posts
    383

    Re: MAX testing using dates

    ok, I've stripped the spreadsheet down into something simpler.

    In a 24 hour day there are 2 shift.

    There are 2 jobs running on 20/03. Job A runs over 2 shifts and needs 2 staff.
    Job B also runs on 20/03 but needs 1 member of staff. So the maximum staff I need on 20th is 2.
    At this point the number showing in K:L2 should be 2

    But Job B doesn't finish until the 22nd so in K3:L3 I need a 1 (1 being the maximum number of staff for that job over 2 shifts)

    Previously I have used the formula in column N2 and O2. But this doesn't take into account that the job runs over 2 shifts on different days.

    Hope I've explained myself a little more clearer...
    Attached Files Attached Files

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1