+ Reply to Thread
Results 1 to 2 of 2

Need help with project status formula

  1. #1
    Registered User
    Join Date
    12-05-2012
    Location
    Milwaukee, WI
    MS-Off Ver
    Excel 2010
    Posts
    45

    Need help with project status formula

    I've attached a spreadsheet with the data I will be working with. I'm looking for help with writing a formula that will indicate whether a project is on time < 3 days overdue returns a 1 (green), > 3 days, but < 6 days overdue returns a 2 (yellow) and anything over 6 days would return a 3 (red). I'm looking to have the actual duration compared to the planned. The problem I am having is that the entire planned duration will be populated at the start of the project and the actual will get filled in as it goes. I am having troubles thinking of a way to write the formula since I can't really do it based on comparing the SUMS of each column (F and G). I also want it to correct itself in that if one task takes 5 days longer than it should have and then another task takes 5 days less than it should have then it should say the project is back on time. The file was crashing a while back when someone else tried opening it. Please let me know if that is the case here. Any help is greatly appreciated.
    Attached Files Attached Files

  2. #2
    Registered User
    Join Date
    12-05-2012
    Location
    Milwaukee, WI
    MS-Off Ver
    Excel 2010
    Posts
    45

    Re: Need help with project status formula

    Does anybody have any other suggestions as to how to track the overall project status based on the data in the above post?

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1