Weld Report

Contractor: Big Time Construction
Line # (B4) WELD DATE: (H4)
Welder 1 name: (5C)
Welder 2 name: (6C)

Weld # (B8) Weld DI: (D8) Weld Type: (F8) NDE DATE:
Heat # (B.C9) Heat # (E.F9) NDE RESULT: PASS ( ) REPAIR ( ) CUT OUT ( )
Welder Stencil: (C10) / (E.F10) DATE OF REPAIR:
Visual Inspection By: NDE RESULT ON REPAIR: PASS ( ) FAIL ( )