+ Reply to Thread
Results 1 to 5 of 5

Outputing engineering cost based on total cost of project. Looking for help with matching

  1. #1
    Forum Contributor
    Join Date
    10-18-2010
    Location
    Walla Walla, Washington
    MS-Off Ver
    Excel 2007
    Posts
    124

    Outputing engineering cost based on total cost of project. Looking for help with matching

    test.xlsx

    Please see the attachment. I am looking for help with matching and maybe indexing. Not working out thus far. When a total price for the job is computed in cell B2, the output of cell C2 corresponds to the chart in B6:B22. Thanks for any help.
    Last edited by cadamhill; 08-17-2012 at 04:52 PM.

  2. #2
    Forum Expert shg's Avatar
    Join Date
    06-20-2007
    Location
    The Great State of Texas
    MS-Off Ver
    2010, 2019
    Posts
    40,689

    Re: Outputing engineering cost based on total cost of project. Looking for help with matc

    =lookup(b2, a6:b22)
    Entia non sunt multiplicanda sine necessitate

  3. #3
    Valued Forum Contributor
    Join Date
    02-04-2009
    Location
    Texas
    MS-Off Ver
    Excel 2016
    Posts
    667

    Re: Outputing engineering cost based on total cost of project. Looking for help with matc

    Please Login or Register  to view this content.

  4. #4
    Forum Contributor
    Join Date
    10-18-2010
    Location
    Walla Walla, Washington
    MS-Off Ver
    Excel 2007
    Posts
    124

    Re: Outputing engineering cost based on total cost of project. Looking for help with matc

    Quote Originally Posted by shg View Post
    =lookup(b2, a6:b22)
    Assuming b2 is the project overall cost, I want to look at the data and find similar pricing. Example is we have an overall cost of 14500, the output will be $2500 because we are in between 14000-15000.

    Im having no luck with you suggestion. Thanks for helping me. Any other suggestions?

    ---------- Post added at 05:17 PM ---------- Previous post was at 05:16 PM ----------

    Quote Originally Posted by CRIMEDOG View Post
    Please Login or Register  to view this content.
    I'm not able to make it work yet. I'll keep looking at it.

    ---------- Post added at 05:24 PM ---------- Previous post was at 05:17 PM ----------

    I got it. Thanks guys. I was able to use either of them. I just had an error in one of my other formulas. thanks. Ill add kudos

  5. #5
    Forum Expert Cutter's Avatar
    Join Date
    05-24-2004
    Location
    Ontario,Canada
    MS-Off Ver
    Excel 2010
    Posts
    6,451

    Re: Outputing engineering cost based on total cost of project. Looking for help with matc

    @ cadamhill

    Based on your last post it seems that you are satisfied with the solution(s) you've received but you haven't marked your thread as SOLVED. I'll do that for you now but please keep in mind for your future threads that Rule #9 requires you to do that yourself. If your problem has not been solved you can use Thread Tools (located above your first post) and choose "Mark this thread as unsolved".
    Thanks.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Friendly URLs by vBSEO 3.6.0 RC 1