I have several worksheets (each worksheet for different tech) and all are set up as tables;
in A2 I have the days of the week Monday, Tuesday, . . . in B2 I have the dates 5/4/2010, . . . and have the dates going through 3/31/2011.
In C2 I have a number I enter daily and in C3 is the variance i.e =sum(c2-.40) - if I do not have anything filled in for the days that have not yet occured, ie 5/16/10 I automatically get -.40. I need my C2 date to calculate for charting mtd and ytd (which I can filter) but am unsure how to go about chart.
Also I can get my mtd and ytd by filtering but was wondering how I would go about doing my mtd & ytd for each of my techs (separate worksheets) into one simple worksheet. All my worksheets have a column for tech ID and name to reference. I need to be able to chart progress individually and as a group. I hope this makes sense.
Thanks for your help![]()
Bookmarks