Hi,

If I have a range of dates like this -

1/31/09
2/28/09
3/31/09
4/30/09

I would like a formula that would pull me the 2/28/09 value.

I know max would give me 4/30/09 and min would give me 1/31/09.

Is there something to give me 2/28/09 or 3/31/09?

Thanks,