I HAVE DATA IN A WORKSHEET. I CAN'T EXPLAIN SO THIS IS WHAT MY WORKSHEET
LOOKS LIKE
A1=374.97 B1=DATE C1=A1/6 D1=DATE E1=A1/6 F1=DATE G1=A1/6
I NEED H1=A1-(C1+E1+G1). THE TRICK IS I DO NOT ENTER ALL THE DATES AT THE
SAME TIME NOR IS IT THE SAME DATES. WHEN I ENTER THE DATE THE VALUE OF C1 E1
AND G1 IS AUTOMATICALLY CALCULATED. SO I NEED H1 TO ABLE TO BE A RUNNING
BALANCE THAT SHOWS THE VALUE OF DATES NOT ENTERED. I HOP THIS IS
UNDERSTANDABLE. I REALLY RALLY HOPE SOMEONE CAN HELP ME. I HAVE BEEN DEALING
WITH THIS PROBLEM FOR THE LAST WEEK OR SO.
THANK YOU
--
NEYSA
Bookmarks