Hi,
I checked your excel. I want the count of the jobs that they have done within the bench mark time.
Say example, If they the scruniaing job is one within the bench mark time then it is should return met else it should return as not met.
Hi,
I checked your excel. I want the count of the jobs that they have done within the bench mark time.
Say example, If they the scruniaing job is one within the bench mark time then it is should return met else it should return as not met.