Hello
I need to measure time taken for a task where the time goes over into the next day.
The Basic formula I have will only cover same day tasks as the Time Out is higher than Time In.
Times are in 24 hour.
Time Period.xlsx
Hello
I need to measure time taken for a task where the time goes over into the next day.
The Basic formula I have will only cover same day tasks as the Time Out is higher than Time In.
Times are in 24 hour.
Try this in E6 and drag it down:
=IF(D6<C6,(D6+1)-C6,D6-C6)